corridor” upgrades the Serbian "Iron Gate 2" navigational lock (Djerdap II, river-km 863). upgrades mooring places on the Austrian Danube: Linz (river-km 2129,22 – 2128,90) Wildungsmauer (river-km 1894,60 – 1895
improved stakeholders` coordination and involvement prepares construction and upgrading measures of mooring places in Austria, Croatia and Serbia The project cost amount to € 3 292 000 and are co-funded by the
overview Fairway conditions Waterway management Water level forecast Adaptation to climate change Mooring places Future investments
steel structure for the measuring point (photo below) was placed on top of it. The high steel structure is necessary in order to be able to place the electronic measuring devices above flood level. The [...] calibrate the measuring devices. The Dürnstein measuring station is…
mission "FAIRway Danube II" with the refurbishment of the Serbian lock Iron Gate II and upgrades of mooring places in Austria. With a total budget of EUR 70 million – including EUR 47 million in EU funding from [...] being procured on the Danube as part of FAIRway Danube II, 19…
overview Fairway conditions Waterway management Water level forecast Adaptation to climate change Mooring places Future investments
overview Fairway conditions Waterway management Water level forecast Adaptation to climate change Mooring places Future investments
services and specially developed platforms such as EuRIS and CEERIS in Europe. A site visit to the mooring place in Wildungsmauer, which was upgraded in 2023 as part of FAIRway works! in the Rhine-Danube Corridor
overview Fairway conditions Waterway management Water level forecast Adaptation to climate change Mooring places Future investments
berth development Berths are important infrastructure elements of waterways, as they allow for the mooring of vessels and their staying outside the fairway. The project aims at further developing the public [...] measures will be achieved in subsequent projects, like the initiative…