Preparing FAIRway2 works in the Rhine-Danube Corridor
At a Glance Bringing the Danube waterway infrastructure forward in an efficient, sustainable and user-oriented way, that is the goal of the study “Preparing FAIRway 2 works in the Rhine-Danube corridor” (07/2020-12/2024). It takes up core aspects of the TEN-T flagship project “FAIRway Danube” and develops them further in order to have them ready for implementation in a follow-up project. “Preparing FAIRway 2 works in the Rhine-Danube corridor”
The project cost amount to € 3 292 000 and are co-funded by the Connecting Europe Facility (CEF) of the European Union. |
Download Folder |
The contents of this publication are the sole
responsibility of the project coordinator and
do not necessarily reflect the opinion of the
European Union.
Last change:
22. 04. 2026