Preparing FAIRway2 works in the Rhine-Danube Corridor
Content
Preparing FAIRway2 works in the Rhine-Danube Corridor
At a Glance
Bringing the Danube waterway infrastructure forward in an efficient, sustainable and user-oriented way, that is the goal of the study “Preparing FAIRway 2 works in the Rhine-Danube corridor” (07/2020-12/2024). It takes up core aspects of the TEN-T flagship project “FAIRway Danube” and develops them further in order to have them ready for implementation in a follow-up project.
“Preparing FAIRway 2 works in the Rhine-Danube corridor”
is a joint, EU co-financed project of Austria, Croatia and Serbia
investigates on possible integrated river engineering projects of the Croatian-Serbian common Danube section, considering inputs of a multidisciplinary stakeholder forum
specifies the further development of the transnational waterway monitoring system (WAMOS)
develops a method for improved stakeholders` coordination and involvement
prepares construction and upgrading measures of mooring places in Austria, Croatia and Serbia
The project cost amount to € 3 292 000 and are co-funded by the Connecting Europe Facility (CEF) of the European Union.
The contents of this publication are the sole responsibility of the project coordinator and do not necessarily reflect the opinion of the European Union.