General
Activity 2: Monitoring of the Croatian/Serbian Danube common section
Monitoring of the hydrological, hydraulic and morphological characteristics of the Danube River and inventory of biodiversity components on the joint Croatian-Serbian sector of the Danube River
Monitoring Plan (Final Version 24.05.2021, updated 14.09.2021)National contact point: Lidija.hubalek(a)mmpi.hr

Final Monitoring Report (for details refer to the national contact point)

  • ANNEX 1: Map of the project area with marked 17 critical sections
  • ANNEX 2: Locations of fish wintering habitats
  • ANNEX 3: Catalogue of biodiversity components
  • ANNEX 4: Analysis of the existing situation
  • ANNEX 5: Piezometers on the joint Croatian-Serbian sector of the Danube River
  • ANNEX 6: Velocity, flow and sediment Study
  • ANNEX 7: Inventory of river regulation infrastructure
  • ANNEX 8: Geodetic hydrographic measurement of the Danube River
Link to the national website:to be provided
Activity 3: Modelling and Multi-Criteria Analysis of the Danube common section
Data Collection, hydraulic and morphological modelling of the Danube River and the Sava River in the Republic of Serbia
Lot 1: Hydraulic and morphological modelling of the SRB-CRO common stretch of the Danube River
General concept for hydraulic and morphological modelling (Final version 16.11.2021)National contact point: ljmihajlovic(a)plovput.rs

Outputs from modelling activities consists of: 

1D hydraulic modelling (encompassing data collection, hydrological study, 1D model setup, calibration, simulation, analysis and interpretation pf results, as well as updating of ENRs)

  • Technical report on 1D hydraulic modelling
  • Technical report on Hydrological Analysis and Update of ENRs

Redefinition and prioritisation of navigational bottlenecks (involves updating the bottleneck catalogue and prioritising those for which 2D models will be developed)

  • Technical report on redefined bottlenecks
  • Technical report on Prioritisation of Navigation Bottlenecks

Definition of criteria for the multi-criteria analysis

  • 2D Model Calibrated and Running
  • Bottlenecks Variants Defined
  • Technical Report on 2D Modeling and Application of MCA

Elaboration of an Integrated study on alternative solutions

  • Integrated study on alternative solutions elaborated
Link to the national website:to be provided
Activity 5: Concept for Stakeholders' coordination
Activity 6: Concept for Stakeholders' coordination
Assessment, Requirement Analysis and Documentation for Mooring Places
Development of mooring place infrastructure in AustriaMs Andrea Haringova: Andrea.Haringova(a)viadonau.org
Assessment on mooring infrastructure and identification of possible measures in CroatiaMr Vjekoslav Simunovic: vjeko.simunovic(a)luv.hr
Assessment on mooring infrastructure and identification of possible measures in SerbiaMr Ljubisa Mihajlovic: ljmihajlovic(a)plovput.rs

 

The contents of this publication are the sole
responsibility of the relevant project partners 
and do not necessarily reflect the opinion of the
European Union.