conservation targets on the Danube east of Vienna. Initial success in the reduction of riverbed erosion The latest analyses of the development of the riverbed on the Danube east of Vienna between 1996 and 2016 [...] dynamic stabilization of the Danube bed and the water level.…
structures (especially groynes and longitudinal training walls) in the free flowing section east of Vienna. In fairway stretches prone to sedimentation, so-called ford areas, this development is particularly [...] Milestones identification of individual structures in need for…
East of Vienna – Test Area and Specific Field of Application In Austria, the Danube in its free-flowing section east of Vienna features the most shallow areas. During extended low-water periods, these [...] loaded barges at the deployment site. By using the barges as flexible…
Projects FGP For the Danube east of Vienna, an integrative Catalogue of Measures was developed within the framework of the " Integrated River Engineering Project on the Danube East of Vienna (FGP) ". The river [...] ecology have been working in partnership for several years to find…
Protection Danube - Marchfeld Protection Dam", the affected dams are being rehabilitated according to the state of the art and raised in sections. In addition, the protective structures east of Vienna near Hainburg [...] the Danube Flood Protection Competition (DHK). The project is…
fairway depths in the entrance areas of the public Danube ports in the free-flowing stretches (Krems an der Donau, Vienna-Freudenau, Vienna-Albern and Vienna-Lobau) are also displayed for the right, middle [...] sections Shallow sections national For the two free-flowing stretches…
are currently four trips per year in the free-flowing stretches east of Vienna and in the Wachau, and two trips per year on the entire Danube route, including the free-flowing stretches. As the Naufahrten [...] border (eastern section). The eastern section includes the two free…
engineering projects.” Restoration of the Danube waterway The bank restoration is part of the river engineering Catalogue of Measures for the Danube east of Vienna. With its completion, two major existing [...] https://www.viadonau.org/unternehmen/projektdatenbank/merlin To the…
proactive maintenance measures, with specific emphasis on the free-flowing stretch of the Danube east of Vienna. Between August and mid-September around 125,000 m³ gravel was excavated from shallow sections [...] navigate the river downstream from Vienna with reduced loaded drafts,…
bioengineering measure was implemented within the context of the Catalogue of Measures for the Danube to the East of Vienna. The implementation took about a month and was mainly done by the local maintenance team [...] The ‘Johler Arm’ has developed itself well since the…