three public mooring places in Linz, Wildungsmauer and Vienna. The construction works in Linz started in December 2020 and aim to improve the safety and the environmental performance of mooring operations [...] identify possible measures and prepare plans for future construction and…
Content User information - cargo shipping To avoid having to run your diesel generators while moored at a mooring place, you can supply your vessel with power from shore. This reduces noise and emissions and [...] 60 minutes of mooring! According to the Austrian Waterways Traffic…
locations of existing public mooring sites in Aschach, Krems and Vienna. Croatia's Strategic Mooring Place Infrastructure Study: A comprehensive study identifying potential mooring sites along the Danube and [...] and discussed at the next Stakeholder Forum meeting. The next…
g development concepts were prepared. For example, the structural condition of the bollards and mooring arrangements on the public berths along the Austrian Danube was assessed. For that purpose, tensile [...] contains information such as the location and lenght of the berth,…
corridor” upgrades the Serbian "Iron Gate 2" navigational lock (Djerdap II, river-km 863). upgrades mooring places on the Austrian Danube: Linz (river-km 2129,22 – 2128,90) Wildungsmauer (river-km 1894,60 – 1895
improved stakeholders` coordination and involvement prepares construction and upgrading measures of mooring places in Austria, Croatia and Serbia The project cost amount to € 3 292 000 and are co-funded by the
macrozoobenthos and fish. Mooring Place Wildungsmauer At the river bank of Wildungsmauer, an existing small craft landing stage has been expanded into a public mooring place for freight navigation in 2022/2023 [...] harbor. The tacking facilities were also renewed. Mooring Place…
overview Fairway conditions Waterway management Water level forecast Adaptation to climate change Mooring places Future investments
steel structure for the measuring point (photo below) was placed on top of it. The high steel structure is necessary in order to be able to place the electronic measuring devices above flood level. The [...] calibrate the measuring devices. The Dürnstein measuring station is…
mission "FAIRway Danube II" with the refurbishment of the Serbian lock Iron Gate II and upgrades of mooring places in Austria. With a total budget of EUR 70 million – including EUR 47 million in EU funding from [...] being procured on the Danube as part of FAIRway Danube II, 19…