Content DoRIS DoRIS - Danube River Information Services, co-developed by viadonau, has played a determining role in the modernisation of inland navigation and has made a significant contribution to the [...] the improvement of safety on the Danube. One of the main tasks of RIS is…
implementation of hydraulic engineering maintenance work on the waterways of the Danube, Traun, Enns, March and the Danube Canal (dredging and hydraulic structures) and the fulfilment of the Republic of [...] Activities on the Water © viadonau Charged with the task of ensuring the…
Content ProDaM - Protect Danube and Morava By implementing the INTERREG project ProDaM, the joint flood management for the border rivers Danube and Morava (March) will be optimised. Austrian and Slovak [...] terrain model. For that purpose, the terrain in the area of the border…
flooding. As the managing body of the Danube Flood Control Agency (Donauhochwasserschutz-Konkurrenz (DHK)) viadonau is responsible for flood protection along the Danube in the area of Krems and from St [...] backwater areas of the Danube. viadonau is also contracted by the…
effects on the Danube waterway. The project area extends on the left bank in the area of river km 1882, directly connecting to the successful Spittelauer Arm ( Dynamic LIFE Lines Danube ) and extending [...] within the framework of the Catalogue of Measures for the Danube east of…
with fairway and navigation signs is an essential prerequisite for the safety of navigation on the Danube. Since the beginning of 2018 viadonau is responsible for the regarding operative tasks (set-up, [...] Shipping Authority of the Ministry of Transport. In order to increase…
upcoming transport branch. At the Danube Business Talks as well as at the RIS COMEX Stakeholder Forum in Vienna renowned experts like Désirée Oen (EU coordinator Rhine-Danube-Corridor), Karin de Schepper (Inland [...] opportunities along the Danube. Thus, the company is supporting…
and was filled with Danube gravel in the course of waterway maintenance in the past. The Danube gravel present there was removed and brought back into the bed load cycle of the Danube. The measure can s [...] enforcement along the Danube bank was lowered over a length of 125 meters…
Monitoring of the Croatian/Serbian Danube common section Monitoring plan (Final Version 24.05.2021, updated 14.09.2021) Activity 3: Modelling and Multi-Criteria Analysis of the Danube common section General concept [...] Content Downloads Project navigation Please choose Preparing…
Together with the Danube, the Fischa forms a substantial network of habitats between Vienna and Bratislava, which is used by numerous plant and animal species as an area for migration. While the upper [...] upper and middle reach of the 35-kilometer-long side-arm of the Danube still…